Pictures of the Week February 9, 2021
The new Port of Alsea marina floats are being set in place. The pilings on the barge will be used to “pin” the floats in place by setting the pilings inside the “holes” within the floats.

The docks are taking shape.

They are starting to set the 60-pilings required for the project into the floats.